Konaktelcit
Engineering Tool

POST SPACING + CONCRETE CALCULATOR

For panel fence, chain-link and pipe-railing projects — compute post count and the concrete volume needed for each footing in one step. Choose square or cylindrical holes, add extra posts for corners and gates, and get a C20/25 concrete mix breakdown ready for the site order.

Inputs

m

Straight-line total length (metres)

m

Distance between two adjacent posts (metres) — typically 2.5 – 3.0 m

Additional posts for corners, gates and end points

Hole shape
mm

In millimetres (typical 250 – 400 mm)

mm

In millimetres (typical 500 – 800 mm)

Logic used

posts = ⌈length / spacing⌉ + 1 + extra_posts

total_concrete = posts × single_hole_volume (+5 % waste)

For a square hole V = a² × h; for cylindrical V = π × (d/2)² × h. A 5 % site-waste allowance is added. One cubic metre of C20/25 concrete needs roughly 350 kg cement, 600 kg sand, 1,200 kg gravel and 175 L water.

Result

No calculation yet

Enter fence length, post spacing and hole dimensions; post count and concrete demand will appear here.

Post spacing guide by fence type

Typical values averaged over dozens of field projects. In high-wind areas, on slopes or under snow load, reduce spacing by ~0.5 m.

Fence typeSpacingPost section
2D panel fence (1.83 m)2.5 m40 × 60 × 1.5 mm
Chain-link mesh, 2.0 m3.0 mØ48 × 2.0 mm
Plain barbed wire line3.0 – 4.0 mL60 × 60 × 6 mm or Ø48
Hand-railing / wrought iron2.0 m40 × 40 × 2.0 mm
Heavy industrial perimeter2.0 m60 × 80 × 2.0 mm

Recommended hole sizes by post type

Footing size depends on wind load, soil class and post height. In clay or loose ground add 100 – 200 mm to the depth.

Post typeHole (a / ⌀)Depth
40 × 60 box post (panel fence)300 × 300 mm600 mm
Ø48 tube post (chain-link)⌀ 300 mm500 mm
60 × 80 box post (industrial)400 × 400 mm800 mm
Gate post (heavy hinge)400 × 400 mm800 – 1000 mm
Corner / brace post350 × 350 mm700 mm

C20/25 concrete mix (per m³)

Standard footing mix compliant with EN 206. Compact with a poker vibrator or steel rod during pour. Without vibration, C16/20 is also acceptable for fence footings.

ComponentAmount
Cement CEM II 42.5350 kg
Sand (0 – 4 mm)600 kg
Gravel (4 – 16 mm)1,200 kg
Water175 L
Water / cement ratio≈ 0.50

Where is it used?

The core sizing tool for post layout and concrete orders across panel fence, chain-link, barbed wire, gate and railing projects. These figures validate excavation and pump-truck requests when preparing a take-off.

Installation note

Plumb each post with a level and brace if necessary; do not remove the braces before 24 hours of curing. Over-sizing corner and gate footings by one step is the cheapest insurance against 3 – 5 years of ground settlement.